岩金矿山地质的基建勘查 为弥补原地质勘探的不足,于矿山设计首采地段,以提高地质勘探程度和储量升级,满足基建开拓、采准和矿山投产的需要为目的的勘探工作是基建勘查,其任务为: 1.补充评价勘探,使矿山在投产伊始保有工业储量可利用的年限,达到同生产规模相适应的要求。 2.首采区段小盲矿体的评价勘探。 3.获得不少于36个月生产利用的开拓矿量和不少于12个月生产利用的采准矿量。 4.进一步查明矿石性质特征及不同矿石类型一工艺类型及自然类型的分布情况。 5.采取有代表性的选矿工艺试验样品和完成金的一工艺矿物学查定工作。 6.查明建矿设计和基建施工所需要的水文及工程地质勘查。
Geological exploration of gold deposits in rock and gold mines To compensate for lack of geological prospecting, mine design in the first mining area, in order to improve the level of geological exploration and reserves to meet infrastructure upgrade, opening and the need to put into production and quasi mines for the purpose of exploration work is the infrastructure for the task of exploration: 1 additional evaluation of exploration, so that the mine at the beginning of the production of industrial reserves to maintain the use of age, to meet the requirements of the same scale of production. Evaluation and exploration of small blind ore bodies in 2 mining area. 3 to obtain no less than 36 months of production and utilization of the development of the mine and not less than 12 months of production and utilization of mining. 4 further identify the nature of the ore and the distribution of different types of processes and natural types of different ore types. 5 to take a representative mineral processing test samples and complete the process mineralogy of gold to check the work. 6 to identify the construction of mine design and construction of the construction of the hydrological and engineering geological prospecting.
|